Toe rail is 75% done

Thanks to the hard work of Bob and Bernard and some last-minute help from Dianna, we were able to complete the installation of the 3rd toe rail. One side of the boat is now completed.

Port side is done

Port side is done

We will still need to notch the rail in a few places to install the cleats. We already cut the rail at an angle to have a nice transition from the rail to the anchor roller.

Rail at the bow

Rail at the bow

The inside of the boat is a total mess as every cabinet had to be removed (at the least the top part).